Door Systems News
Union Bank Plaza undergoes $20 million renovation
The first phase in the historic preservation-minded rehabbing of Union Bank Plaza (UBP) in Downtown Los Angeles has wrapped up. Completed in 1967, the 40-story office tower, designed by Harrison & Abramovitz and Albert C. Martin &…
LAFD Commercial Structure Fire
Just after 03:30 hours, Los Angeles Fire Department Battalion 1 companies were dispatched to a reported structure fire in 17’s first-in at the intersection of Long Beach Ave. x Washington Blvd.
E14 was first on-scene and unable to…
Understanding Building Construction Types
Buildings are broken down into five categories (Types 1–5), ranging from the stoutest of construction to that which will most likely fail rapidly when under fire conditions. Each building type has specific characteristics that ladder companies…
Rising Construction Costs
Labor and materials are arguably the two most critical ingredients of any construction project. No buildings transform skylines, no bridges span rivers and no homes rise from foundations without them. That’s why pricing of these two production…
Arts District High Rise Starts Work
San Francisco-based developer Carmel Partners has broken ground on its first Arts District project. The planned 35-story project designed by Works Progress Architecture will rise at 520 S. Mateo St., near the Fourth Street Bridge. The…
Under Construction Building Fires
The potential for extensive damage during a fire event is greatest when a building is under construction because it is largely unprotected. Code-required fire-suppression systems such as sprinklers and fire walls are typically nonexistent until…